RCD Safety Switch Testing
ETS conduct a 6 monthly, yearly or bi-yearly procedure (Pending environment) to ensure that the Australian Standard is being met.
RCD Safety Switch Testing Procedures
Locate switchboard and identify circuits protected by RCD’s
Check switchboard door hinge, locking mechanismand weatherproof seal
Clean outside switchboard and general area
Barcode RCD Circuits for tracking and data management procedure
Push button test to ensure RCD is operational
Plug in RCD test device and measure for trip time and current in accordance with Standard
Record all test results and action taken